Meaning
Formal evaluation conducted at the end of a development phase determines if a project has met its criteria to move forward. This stage gate inspection acts as a checkpoint to catch design flaws or manufacturing issues before they become too expensive to fix. It is used in complex engineering projects where the cost of failure increases at each subsequent step.
Decision Point
Senior management or technical experts review the data from the completed phase to decide on the future of the project. A stage gate inspection results in a go or no go decision based on the demonstrated performance of the prototype. This prevents the waste of resources on designs that cannot meet the required production yield.
Quality Filter
Removal of non conforming parts or processes from the development stream ensures that only the most reliable configurations reach the final assembly line. During a stage gate inspection the team compares the actual results against the initial engineering requirements. If a parameter is not met the project must return to the previous stage.
Readiness Evaluation
Assessment of the capability of the supplier to scale up from a pilot run to full production follows the successful completion of the final check. The stage gate inspection verifies that the tooling and the supply chain are ready for the increased volume. Calling this inspection too early results in high scrap rates and delays while calling it too late increases the time to market.
It provides the final verification that the manufacturing yield will be high enough to sustain the commercial launch.