Meaning
Controlled administrative protocols govern the formal evaluation, temporary authorization, and documented acceptance of parts that deviate from engineering specifications but remain functionally acceptable. In volume production, concession governance establishes the approval hierarchy, risk assessment criteria, and traceability measures required before non-standard components enter the assembly stream. The standard application prevents unnecessary scrap while maintaining strict configuration control across finished products.
Derogation Protocol
Production facilities initiate deviation requests when machining errors, material property shifts, or tooling wear create minor drawing variances. The concession governance process requires manufacturing engineers to document the exact dimension out of tolerance and calculate safety margins under operational loads. Quality managers review the variance against fit, form, function, and regulatory certification requirements.
Concessions remain limited to specific quantities or defined production calendar windows rather than serving as permanent drawing changes.
Risk Assessment
Engineering teams verify that deviations do not compromise fatigue life, assembly ergonomics, or product durability. Stress calculations and finite element models determine whether the dimensional variance reduces service life under cyclic loading conditions. If safety-critical interfaces or aesthetic Class-A surfaces are affected, authorization requires customer sign-off alongside internal quality director approval.
Traceability systems track every concession number against serialized units to maintain field service integrity.
Authorization Authority
Concession approvals follow a strict hierarchy where local plant quality managers can approve minor non-functional deviations up to fixed batch sizes. Deviations impacting mating interfaces require signatures from the chief product engineer and program director. Complete audit logs archive every concession request, inspection report, and engineering justification for ten years to support regulatory audits.
When the authorized quantity expires, production must revert to nominal blueprint specifications immediately.