Meaning
Standard international construction contracts provide the supervising engineer with the authority to order the removal and replacement of non-conforming materials or work. This specific power under fidic subclause 7.6 ensures that any defective plant or equipment is rectified promptly to maintain project quality. Failure to comply with these instructions allows the employer to hire others to do the work at the contractor’s expense.
Contractual Ground
Remedial instructions can be issued at any time before the issue of the taking-over certificate. When defective work is identified, fidic subclause 7.6 allows the engineer to demand immediate demolition or replacement. Contractors must execute the work at their own cost if the defect arises from poor workmanship or materials.
Financial Consequence
Disregarding an engineer’s instruction to rectify defective work leads to direct financial penalties and alternative procurement actions. If the contractor fails to carry out the remedial actions within the specified reasonable time, fidic subclause 7.6 allows the employer to employ other persons to perform the work. The employer then recovers all costs incurred from the contractor, which can be deducted from interim payment certificates or claimed against the performance security.
This mechanism protects the owner from prolonged delays and substandard execution while maintaining a clear commercial remedy.
Process Flow
The instruction process begins with a formal written notice detailing the non-conforming items and setting a deadline for rectification. The contractor receives this directive, assesses the scope of remediation, and executes the necessary corrections. These corrected works are then re-inspected by the engineer to ensure compliance with the specification.