Meaning
Standard form of contract for plant and design-build projects where the contractor takes responsibility for the design. The fidic yellow book provides a balanced framework for international construction where the employer provides a set of requirements instead of a full design. It defines the obligations of the engineer who acts as an agent of the employer to supervise work and certify payments.
Liability Distribution
Allocation of design risk falls primarily on the contractor under these conditions. While the employer remains responsible for the accuracy of original data, the fidic yellow book requires the contractor to scrutinize the requirements before starting work. This shift ensures that the party most capable of managing technical errors holds the responsibility for correcting them.
Failure to identify errors early leads to costs that the contractor must absorb.
Payment Structure
Monthly valuations govern the flow of funds from the employer to the contractor. Every month the fidic yellow book allows for an interim payment certificate based on the actual progress of the design and construction. This system maintains a steady flow of cash to the contractor while protecting the employer from overpaying for uncompleted work.
Completion Order
Final acceptance occurs only after the successful passing of tests on completion.