Meaning
Schedule of output targets that bridge the gap between initial pilot production and the steady-state manufacturing rate. It tracks the progress of a facility as it moves through the stabilization phase, excluding the research and development period.
Volume Acceleration
Successive increases in daily or weekly output targets provide a structured path for scaling operations. Early stages of the ramp curve typically involve lower speeds to allow for the identification of defects and the training of the workforce. As the process matures, the rate of increase grows until the line hits its nameplate capacity.
Learning Progression
Gains in individual and team performance contribute to a steady reduction in the time required to complete each task. Standard work instructions and repeatable processes are established during this period to ensure that quality remains consistent as the speed increases. Errors found during the initial phase are used to update training materials and prevent future occurrences of the same issue.
Capacity Goal
Final target represents the demonstrated ability of the factory to produce at the rate required by the market. Meeting the endpoint of the ramp curve confirms that the capital investment has delivered the promised throughput. Falling short of this goal indicates a need for additional equipment or a fundamental redesign of the workflow.