Meaning
A heuristic algorithm used in production planning to select the next job for processing from a queue of waiting orders at a workstation. Implementing a dispatch rule helps a manufacturing facility manage daily task sequencing without requiring complex global optimization schedules. This decision tool guides operators on which batch to load next to meet immediate delivery dates or minimize setup times.
Allocation Logic
Dynamic schedules prioritize tasks by calculating a specific index for each job in the queue. This calculation often uses the ratio of remaining time before the due date to the remaining processing time, which is known as the critical ratio. Jobs with the lowest ratio receive the highest priority to prevent late deliveries.
This localized decision-making reduces the burden on centralized planning systems.
Process Sequencing
Common configurations sort the work queue by earliest due date or shortest processing time. This sequencing runs autonomously at each workstation. It keeps the production line moving without constant supervisory intervention.
Practical Limit
This localized approach often leads to sub-optimal choices for the production line as a whole because it ignores upstream bottlenecks. When local priorities conflict with global demand, work-in-progress inventory tends to rise. This requires regular synchronization with the master production schedule.