Meaning
Quality control protocols allow the release of non-conforming materials that deviate from specified engineering limits but still satisfy essential safety and functional criteria. This formal variance, known as acceptance under concession, requires engineering approval before the affected batch can bypass standard rejection procedures. It restricts the usage of such components to specific production runs where their minor deviations do not compromise the integrity of the final assembly.
Without this mechanism, production lines face expensive shutdowns over minor aesthetic or non-functional discrepancies.
Technical Evaluation
Engineering teams analyze the physical properties of the out-of-specification part to confirm that structural limits are preserved. When a supplier submits a request for acceptance under concession, laboratory tests must prove that the deviation does not affect performance or service life. The evaluation documents the actual measurement alongside the drawing tolerance.
Financial Implication
Scrapping a specialized batch of semi-finished goods represents a direct loss in raw materials and machine hours. Utilizing acceptance under concession prevents these immediate write-offs and protects the delivery schedule from disruption. The manufacturer often negotiates a price discount with the supplier to offset the administrative cost of processing the deviation.
Risk Boundary
Uncontrolled usage of non-conforming goods can lead to systemic failures if the cumulative tolerance stack-up exceeds safe limits. For this reason, acceptance under concession cannot apply to safety-critical components or primary load-bearing structures. Traceability must be maintained by marking each conceded item with a unique batch number.